techy.
← All business tools

Make the scope as clear as the price.

Build an estimate from tasks, hours and rates. Record exclusions, compare versions and export a scope you can review with a client.

Practice: compare two worked scenarios

Compare 16 versus 24 implementation hours. Keep discovery and review at 4 hours each, all rates at $75/hour, expenses at $100 and contingency at 10%. The extra eight hours add $600 labor and $60 contingency. This is an estimate, not an invoice.

  1. Load the baseline example, press Calculate, then Save as baseline.
  2. Load the variant, press Calculate, then check the exercise.
  3. Export CSV to keep both scenarios and their assumptions.

Expected: $2,090.00 baseline → $2,750.00 variant; $660.00 difference.

Fictional inputs. Loading an example replaces the visible inputs only after confirmation. It never overwrites your saved draft; saving locally remains a separate action.

Build your scenario

Your inputs stay on this device. No signup or paid API.

Deliverables and effort (maximum 20)

Estimated project total

Your numbers.
A clearer decision.

Calculate to see the breakdown, then save a baseline and explore a second scenario.

Example inputs — replace them with your assumptions, then calculate.

Saved inputs stay until you remove the draft or clear site data. Do not enter sensitive information on shared devices. Exported files contain your inputs.

Understand the numbers

Labor = sum of each task’s hours × hourly rate. Subtotal = labor + direct expenses. Contingency = subtotal × contingency percentage / 100. Estimate = subtotal + contingency.

Worked example

Fictional example: discovery takes 4 hours, implementation 16 and review 4, all at $75/hour. Labor is $1,800. Add $100 of direct expenses and a 10% contingency on the $1,900 subtotal: the estimate is $2,090. If implementation grows to 24 hours, the same method gives $2,750 — a $660 increase.

Try a different scenario

Describe a deliverable, not just an activity: ‘a tested signup form with an error state’ is easier to review than ‘development’. Record an acceptance check and what is excluded. Freeze a baseline before adding scope, so the discussion can show which hours changed. Export both versions and review the document before sharing private commercial information.

What this estimate leaves out

The estimate excludes sales tax, currency conversion, financing, discounts and payment terms. It is not an invoice, contract or guarantee. Contingency is not markup or margin. Confirm which expenses may be passed to the client and agree how scope changes will be approved.

Make the result actionable

Read the related practical guide →

Method and examples by Techy · September 20, 2026 · Editorial policy (Spanish)